Whitewater Septic Upgrades

In 2022 Whitewater started construction of the Hummingbird Lodge, campground and new mountain operations building. Under the administration and design of Highland Consulting Ltd,. Kays was awarded the work to construct a new septic field and tanks to the hummingbird lodge/campground and a new tank and tie in to the existing system for the mountain operations building.

The new field was located 1600m away from the lodge and a new main was required to connect the two. The undulating terrain required the installation of multiple air release valves for the system to perform properly. The site conditions and size of the tanks required multiple crane hoists and diligent grading by the Kays team.